BRAMLEY PARISH COUNCIL
Minutes of the Meeting of the Council
| Date: | Tuesday 20th October 2026 | Time: 7.00pm |
| Place: | Bramley Room, Bramley Village Hall | |
| Present: | Cllr Tony Durrant (Chair) | Cllr Malcolm Bell |
| Cllr Keith Oborn | Cllr Chris Flooks | |
| Cllr Sue Howell | Cllr Alan Munday | |
| Cllr Chris Tomblin | ||
| In attendance: | Maxta Thomas (Clerk) | 4 members of the public |
| Apologies: | Cllr Iain James | Cllr Jan Wright |
| Cllr Rhydian Vaughan (HCC) |
Cllr Durrant announced that Nick Robinson, a former Bramley ward councillor for Basingstoke & Deane Borough Council, has passed away. A minutes’ silence was held in his memory.
| Action | ||
| 1 | Apologies for Absence | |
| As listed above. | ||
| 2 | Declarations of Interest | |
| Cllr Durrant noted his position as Chair of the BDBC Development Control Committee and took no part in any decision on planning applications. | ||
| 3 | Minutes of the Last Parish Council Meeting | |
| 3.1 | The minutes of the meetings held on 21st July 2026 and 15th September 2026 were reviewed. Cllr Howell proposed that the minutes were a true account of the meetings, Cllr Tomblin seconded, unanimously agreed. The Chairman duly signed the minutes. |
|
| 3.2 | Matters arising | |
| · Replacement bus shelters – Rocon have confirmed that delivery of the new shelters is due on 5th November, and that it will take a few days to assemble and install them. There will be traffic management in place for the delivery. Grant funds have been received from HCC. | ||
| 3.3 | Outstanding actions | |
| · Cllr Bell has written to Horticultural Society re shade dwelling plants for the Parish Green. | ||
| 4 | Open Forum | |
| · A resident noted that tree roots are coming through on the Cinder Track. Two people have tripped on these recently. Bramley PC has reported the issue to Network Rail, and will update them with details of the falls. |
Clerk |
|
| 5. | County Councillor Report – see appendix A.
· Ditch work on Sherfield Road has been tidied up as promised. Cllr Bell to contact Cllr Vaughan to get the same done for Minchens Lane. |
Cllr Bell |
| 6. | Borough Councillor Report
· The Local Government reorganisation has been with withdrawn. Direction from the Government is expected fairly soon. Elections next year will be as normal. However it is likely that the Hampshire Mayor will be elected in 2027. · Local Plan Scoping Consultation – It will include an updated call for sites. BDBC is still waiting for detail from water companies. · Alternate bin collections began on 12th October. Bring banks for plastics are in place in 6 locations around the Borough. Cllr Tomblin requested thoughts on where once could be placed in Bramley. · Changes to the planning system from the end of October were noted. Members will no longer be able to call in applications. |
|
| 7. | Parish Environment | |
| 7.1 | Bramley Green maintenance review – the maintenance for Bramley Green has been reasonably successful this year, with the autumn cut being carried out two weeks ago. A few of the wooden posts need replacing. The wildflower section was particularly noted.
It would be helpful for a report on the biodiversity of Bramley Green since the start of the wilding project. Cllr James to take forward. A final decision on the maintenance for the 2026-27 season will be taken at the November 2026 meeting. |
Cllr James Clerk |
| 7.2 | New Honours Board – the Clerk has circulated a quote and example of a possible new Honours Board. Cllr Oborn proposed 1200mm by 600mm dark oak with gold lettering. Cllr Howell seconded, unanimously agreed. Cllr Bell to ask for a sample of what it might look like, and Clerk to order in due course. |
Cllr Bell Clerk |
| 7.3 | ‘Walking Bus’ to Bramley School – Cllr Oborn proposed an idea to institute a walking bus to assist children getting to school in Bramley. This would involve a collection point for the children, and then they would be escorted to school by a number of responsible adults (parents) who would assist with crossing any roads safely. It is hoped that this will reduce emissions from parents dropping children of the school, easing parking, and ensuring safety for the children.
Cllr Oborn to speak to the school about feasibility. Hi viz jackets will be needed, and public liability insurance, DBS checks. Support from the PC would be grants for simple equipment, and help with publicity. |
Cllr Oborn |
| 7.4 | Stagecoach bus tracking app – Stagecoach app is unfortunately not particularly accurate. There are other bus tracking apps, as well as rail tracking apps. Cllr Oborn to investigate further. Cllr Oborn proposed promoting the Stagecoach bus tracking app via the PC website and social media. This was seconded by Cllr Howell and unanimously agreed. Cllr Oborn and Clerk to take forward. |
Cllr Oborn Clerk |
| 8 | Clerk’s report & Administration | |
| 8.1 | Parish magazine article – Cllr Howell is due to write the article for the December edition, which is due on 15th November. | Cllr Howell |
| 8.2 | External Audit update – the Clerk gave an update to the Council. The documentation from the annual external audit has been received, and the Council passed with only two minor comments and no matters of concern. The documents have been placed on the PC website. | |
| 9 | Reports | |
| 9.1 | Planning Committee – see Appendix B
Cllr Durrant to no part in any vote on planning applications. Cllr Flooks gave a brief update on the October Planning Committee meeting. Cllr Munday proposed that planning decisions be accepted by full Council. This was seconded by Cllr Oborn and unanimously agreed. Clerk to take forward. |
Clerk |
| 9.2 | Allotments and Burial Ground – see appendix A
i. Burial Ground improvements – Cllr Howell outlined possible plans to clear the ‘rubbish area’ at the Bramley PC Burial Ground. This would involve removing the existing hedging, clearing and levelling the area, and putting grass seed down. A fence would be placed near the ditch, and a couple of benches could be installed. Ultimately, the area could be consecrated and used as an ashes interment area. An outline quote has been received for this. Cllr Durrant reminded the council of its previous decision to wild the area and put in a yew hedge. Ownership of the land needs to be resolved before any further major work is carried out. Discussions need to be held with the St James PCC about management of the Burial Ground. Suggest a working group with Parish Councillors and the PCC. Cllr Howell and Clerk to be part of the group. ii. Allotments – issues with some plots; these are being addressed. Renewal of tenancies will go out in December. iii. Land registry – noted that we have a copy of the original conveyance, but not the original. PCC and Hampshire Archives do not keep such documents. Getting the land registered will need the involvement of a solicitor. St James Church has registered the land the Burial Ground is on. |
Cllr Howell Clerk |
| 9.3 | Village Hall Trust – see appendix A
· Cllr Durrant raised an issue of the big puddle at the bottom of the slope to the entrance of the Bramley Room. Cllr Howell to feed this back to the Trustees. |
Cllr Howell |
| 9.4 | Clift Meadow Trust – see appendix A
· New lighting has been installed. · New flooring is being installed this week. · Dog fouling is becoming a problem on the Meadow. · Lots of good input into the kitchen refurbishment at the Community event. · New shed – three outline quotes have been received. Will be on November agenda for further consideration. |
Clerk |
| 9.5 | Highways/Footpaths
· Nothing to report. |
|
| 9.6 | Chairmans Report – no report. | |
| 10 | Events | |
| Volunteer Showcase event – Cllr Wright has circulated a report on the this event, which was held on 3rd October 2026.
Discussion postponed to November due to Cllr Wright’s absence. |
||
| 11 | Consultation documents requiring consideration | |
| 11.1 | Local Plan Scoping Consultation – to be considered at November meeting. | |
| 12 | Grant Applications | |
| 12.1 | Bramley Craft Group – a grant request to cover the hall hire for 2026-27 has been received. The Group has been running successfully since this time last year, with a current attendance of 15 to 18 people. It is designed to help attendees meet new people and assist with mental health.
Cllr Tomblin proposed giving the grant, Cllr Munday seconded, unanimously agreed. Clerk to take forward. |
Clerk |
| 12.2 | Bramley Walking Group – a grant request to cover the hall hire for 2026-27 has been received. The Group has a current attendance of 18 to 20 people. It is designed to help attendees meet new people and assist with mental and physical health. The hall is used for refreshments after the walk.
Cllr Howell proposed giving the grant, Cllr Oborn seconded, unanimously agreed. |
Clerk |
| 12.3 | Royal British Legion donation – the Clerk confirmed that a wreath has been reserved for Bramley Parish Council to lay at the upcoming Remembrance Day service. Cllr Durrant or Bell to lay the wreath on behalf of the PC.
Cllr Munday proposed giving a donation of £1000 to the Royal British Legion. Cllr Bell seconded, unanimously agreed. Clerk to take forward. |
Clerk |
| 12.4 | Speedwatch grant for insurance – ratification – the grant application for this came in after the September meeting. It was date sensitive, hence the decision being taken via email. Cllr Durrant proposed ratifying the decision to pay the Speedwatch insurance of £814, Cllr Oborn seconded, unanimously agreed. | |
| 13 | Applications for CIL funding | |
| 13.1 | CIL Income & Expenditure update (see appendix C)
The Clerk has circulated the latest update on CIL expenditure. A transfer of £3,000 will be made from the CIL account to the current account to cover the cost of a deposit for the flooring work at Brocas Hall |
|
| 13.2 | Cross House – a grant request has been received from the PCC to improve the lighting at Cross House. This would replace the original lighting fitted when Cross House was built in the 1990s. The new proposed lighting will be LED, which should improve energy consumption and energy bills, and bulbs will need replacing far less often. The new lighting system should also be far more effective than existing lighting, which in turn will hopefully make the facility more attractive to potential hirers. The total grant requested is £3,360.
After some discussion, Cllr Tomblin proposed giving the grant, Cllr Howell seconded, unanimously agreed. Clerk to action. |
Clerk |
| 13.3 | Little Apples of Bramley – the village pre-school group has requested a grant of £858 to cover the cost of two I-pads. These will assist in recording children’s learning and achievements via a dedicated leaning journal. The grant requested will cover the cost of the I-pads only – any other costs involved will be covered as necessary by Little Apples.
Cllr Howell proposed giving the grant, Cllr Oborn seconded, unanimously agreed. Clerk to action. |
Clerk |
| 13.4 | Bramley Village Hall – a grant request of £4,800 has been received to cover the cost of redecoration of the Bramley Room, Frith Room, and lobby areas of the hall. All of these areas have seen increased usage in recent years, and as a result are in need of redecoration.
Cllr Flooks proposed giving the grant, Cllr Bell seconded, unanimously agreed. Clerk to action. |
Clerk |
| 14 | Finance | |
| 14.1 | Approval of payments (see appendix D) – the Clerk has circulated the list of payments for approval. Cllr Howell proposed and Cllr Tomblin seconded that the October 2026 payments be approved. Majority approved – Cllr Bell abstained. Clerk to process. |
Clerk |
| 14.2 | Receipts (see appendix D)
These were noted. |
|
| 15 | Date of Next meeting | |
| The next full Parish Council meeting is scheduled for Tuesday 17th November 2026. | ||
| 16 | Resolution to exclude press and public from items that may require discussion of possible legal and financial proceedings | |
| Cllr Tomblin proposed the motion, Cllr Bell seconded, unanimously agreed. The press and public left the meeting. | ||
| 17 | Confidential Items | |
| 17.1 | Legal matter update – the Chair gave an update on an ongoing legal matter.
Draft directions to the court have been submitted. Next step may be mediation – an update from the solicitor is awaited. |
|
| The meeting closed at 8.58pm. | ||
Signed: …………………………………………………………………. Date: ………………………………………
(Chairman)
Appendix A –Briefing notes
COMMUNITY SPEEDWATCH
SIDs – All 4 SIDs were in operation throughout September.
The data recorded at Bramley Corner remains concerning. A speed of 82mph was recorded. With 25 vehicles recoded exceeding 60mph.
Recent Local SpeedWatch Activity – 2 manned Deployments were undertaken during September. A total of 15 vehicles were reported to the Police from the 280 vehicles checked by Bramley SpeedWatch – hit rate 5%. Top speed recorded 42 mph.
Equipment:
Camera: AutoSpeedWatch – No issues, the camera continues to work well.
The camera warning sign on The Street was removed by the builders at Stocks Farm. I have requested the builder that the sign be replaced ASAP. I have informed Hampshire Highways of it’s removal and they have written to the builder requesting that it be put back up. To date the builder has not replaced it. Can the PC please take this up directly. September update: Still no sign. Highways have been chased again and they are contacting the developer again.
The Laser SpeedGun has been sent away for calibration.
Gerneral – A Parish council grant request has been raised fot the insurance cover. There has been a large increase in cost over last year due to the addition of the extra SIDs and Laser Speed Gun (approx £20k in extra cover).
SpeedWatch host several Councillors from Farnham who wanted to see our SpeedWatch Equipment and how we run the scheme. We received good feedback from them.
Note: Declining numbers in winter months due to reduced daylight hours.
Table 1: Camera Data
The following camera data was downloaded on the 30thSeptember 2026.
| Month/Year | Verified Speeders =>35mph | Max Speed Recorded | Highest number of offences committed by one vehicle * | Fastest Hour | Illegal
Vehicles |
| May 2024 | 2752 | 58 | 15 | 7pm | |
| June 2024 | 3338 | 60 | 17 | 10am | |
| July 2024 | 3104 | 61 | 18 | 2pm | |
| August 2024 | 2616 | 59 | 13 | 5am | 73 |
| September 2024 | 1087 | 54 | 7 | 5am | 47 |
| October 2024 | 1032 | 55 | 11 | 9am | 34 |
| November 2024 | 749 | 51 | 6 | 11am | 20 |
| December 2024 | 432 | 53 | 3 | 8am | 11 |
| January 2025 | 593 | 57 | 5 | 1pm | 21 |
| February 2025 | 963 | 50 | 9 | 12pm | 32 |
| March 2025 | 1931 | 55 | 13 | 6pm | 37 |
| April 2025 | 2656 | 56 | 13 | 7pm | 85 |
| May 2025 | 3169 | 57 | 13 | 7pm | 37 |
| June 2025 | 2635 | 57 | 12 | 8pm | 68 |
| July 2025 | 1544 | 60 | 10 | 5am | 40 |
| August 2025 | 2560 | 55 | 17 | 5am | 78 |
| September 2025 | 1953 | 52 | 15 | 5am | 62 |
| October 2025 | 1585 | 50 | 9 | 5pm | 47 |
| November 2025 | 793 | 55 | 7 | 12pm | 26 |
| December 2025 | 469 | 50 | 4 | 3pm | 17 |
| January 2026 | 581 | 52 | 8 | 9am | 14 |
| February 2026 | 285 | 46 | 4 | 7am | 14 |
| March 2026 | 1254 | 52 | 6 | 6am | 29 |
| April 2026 | 2116 | 53 | 14 | 5am | 47 |
| May 2026 | 2635 | 57 | 10 | 5am | 69 |
| June 2026 | 2376 | 57 | 11 | 5am | 64 |
| July 2026 | 2791 | 56 | 21 | 5am | 72 |
| August 2026 | 2712 | 60 | 17 | 5am | 63 |
| September 2026 | 2390 | 55 | 17 | 5am | 70 |
| Total Verified speeders | 53,101 |
The Camera trigger and reporting speed are set at =>35mph. Illegal vehicles = no tax, no Mot, or no Tax and Mot.
*Persistent offenders: The Police continue to visit persistent offenders.
Camera statistics for September 2026
Table 2: Speed Indicator Device (SID) Data|: September 2026
| SID Location | Days Deployed | Traffic
Direction |
%
Exceeding 30mph |
No
Exceeding 60mph |
Max
Speed Recorded |
V85* | Average speed |
| Bramley
Corner |
30 | East bound | 73% | 25 | 82 | 40 | 34 |
| Farriers | 30 | West bound | 31% | 0 | 47 | 33 | 29 |
| The Street
Beaurepaire |
30 | East bound | 38% | 0 | 57 | 33 | 29 |
| The Forge | 30 | West bound | 59% | 0 | 56 | 35 | 31 |
Graham White
Bramley Speedwatch Co-ordinator
1st October 2026
ALLOTMENTS/BURIAL GROUND
No written report received.
VILLAGE HALL TRUST
No written report received.
CLIFT MEADOW TRUST
No written report received.
BOROUGH COUNCILLOR REPORT
No written report received.
COUNTY COUNCILLOR REPORT
Hampshire County Councillor Update 63 – Calleva Division September/October 2026
September has been another very busy month across Hampshire and Romsey Rural. The most significant county-wide development was the Government’s decision to withdraw its local government reorganisation proposals for Hampshire and the Solent. There have also been important updates on Hampshire’s finances, the condition of our roads, major motorway works and the new Combined County Authority.
Locally, we have continued to publish regular information about roadworks and planning applications, along with updates from our villages and community organisations. I have brought the main points together below, including the most useful information from the first few days of October.
Highways Information
Making the case for fairer highways funding
Hampshire has around 5,500 miles of roads to maintain—one of the largest local highway networks in the country—but we do not receive enough stable, long-term funding to keep that network in the condition we all want to see. The estimated maintenance backlog is now between £550 million and £600 million.
The County Council’s Cabinet has agreed to strengthen our case to Government for a fairer share of Vehicle Excise Duty to be invested back into local roads, together with greater freedom to target highways funding where it will make the biggest difference.
We are not waiting for Government action. Since April, highways teams have delivered 42 resurfacing schemes, with 101 planned during 2026/27, completed 122 preventative surface treatments and 154 planned patching schemes covering more than 32,000 square metres. Between April and July, teams also repaired 17,590 reactive defects, including potholes.
The long-term answer is to move increasingly from reacting to potholes to planned, preventative maintenance. Hampshire’s highway assets are valued at around £17 billion, and looking after them properly is basic asset management as well as being important to residents and businesses.
Original update: facebook.com/nickadamsking
M3 Junction 9 closures
National Highways has moved traffic onto the new roundabout at M3 Junction 9 and is beginning the next phase of work, including demolition of the old bridges and further improvements to the northbound exit slip road.
The key dates currently advised are:
- 9pm Friday 9 October to 6am Monday 12 October—closure of the M3 northbound exit slip road.
- Overnight on Friday 9 and Sunday 11 October—closure of the M3 northbound between junctions 10 and 8, from 9pm to 6am.
- 9pm Friday 23 October to 6am Monday 26 October—full M3 closure in both directions between junctions 8 and 9 for demolition of the northern bridge.
- 9pm Friday 6 November to 6am Monday 9 November—full M3 closure in both directions between junctions 8 and 9 for demolition of the southern bridge.
Please allow extra time, follow the signed diversion routes and check the latest information before travelling. National Highways advises drivers not to rely on satnavs during closures because they may direct vehicles onto unsuitable roads or back towards closed sections.
Latest information: National Highways road closure report
Live traffic information: trafficengland.com
Reporting Highway Problems
Links to report road issues are here:
- Potholes: https://www.hants.gov.uk/transport/highways/report-a-problem/potholes
- Tree/hedge problems: https://www.hants.gov.uk/transport/highways/report-a-problem/treehedge
- Flooding/drainage issues: https://www.hants.gov.uk/transport/highways/report-a-problem/flooding
- Pavement problems: https://www.hants.gov.uk/transport/highways/report-a-problem/paving
- Broken or missing signs: https://www.hants.gov.uk/transport/highways/report-a-problem/brokensigns
- Faulty street lights: https://www.hants.gov.uk/transport/highways/report-a-problem/streetlight
- Faded or missing road markings: https://www.hants.gov.uk/transport/highways/report-a-problem/road-markings
- Problems with rights of way: https://www.hants.gov.uk/landplanningandenvironment/rightsofway/reportaproblem
When reporting an issue, you’ll be sent an email confirming a reference number. If you would like me to follow this up, do please forward that message to me and I will chase it for you.
Local Government Reorganisation
Government withdraws its Hampshire decision
On 7 September, the Government withdrew its decision on local government reorganisation in Hampshire and the Solent and ordered a review. This was the best possible outcome at this stage and gives councils the opportunity to start again with proper time, evidence and financial analysis.
Hampshire County Council had launched Judicial Review proceedings because the Government had not provided satisfactory answers about the evidence behind the decision or the financial sustainability of the proposed new councils. The earlier proposals also risked splitting established communities, including the New Forest, and transferring major areas of growth and business-rate income between authorities.
We were particularly pleased for everyone involved with New Forest Together. Campaigners collected tens of thousands of signatures and presented their petition to Parliament on the day the decision was withdrawn.
This does not mean that nothing should change. It means that whatever comes next must be properly costed, financially sustainable and command much broader support.
Who pays for the abandoned process?
Councils across Hampshire were required to work to Government deadlines, incurring legal, consultancy and implementation costs and diverting many hours of senior officer time from service improvement and financial sustainability work.
we have asked the County Council to establish the full cost of the process to Hampshire and to call on Government to reimburse councils. Every pound unnecessarily spent on a process that has now been withdrawn is a pound that cannot be spent on services residents rely upon.
Hampshire and the Solent Combined County Authority
In its first weeks, the new Combined County Authority has been putting in place the foundations for regional collaboration across Hampshire, the Isle of Wight, Portsmouth and Southampton.
The initial work has focused on:
- Developing a Local Growth Plan that builds on the region’s strengths and supports future investment.
- Preparing a Strategic Skills Plan ahead of taking on devolved adult-skills responsibilities.
- Establishing the boards, committees and partnerships needed for transparent, joined-up decision-making.
- Listening to residents, businesses and partners about local priorities and where regional action can add most value.
By working across boundaries, the Authority can give our region a stronger voice and improve access to jobs, skills, transport, housing and opportunity. Early discussions have included long-term youth unemployment and how to ensure that growth benefits residents, communities and businesses across the whole region.
Hampshire County Council’s Finances
During September, the Government confirmed more than £90 million of in-year Exceptional Financial Support for councils facing serious financial pressures, including £6 million for the Isle of Wight and £5 million for West Berkshire.
Hampshire has not had to make a similar request because the County Council acted early. Over the past year, we delivered £95 million in savings, with a further £40 million of efficiencies built into this year’s budget. That work enabled us to set a lawful, balanced £3.3 billion budget and manage this year’s pressures without seeking exceptional permission to borrow or use capital resources for day-to-day costs.
That does not mean everything is fine. This year’s budget relies on £108.5 million from reserves—almost twice the amount used last year—and those reserves can only be spent once. School transport costs, particularly for children with special educational needs and disabilities, have risen from £43 million to £83 million in four years, while demand for adult social care continues to increase.
In 2025/26 Hampshire received £91 per resident in general Government funding, compared with an English average of £205. The new funding formula reduces support by £10.9 million this year and by £42.9 million annually by 2028/29. I will continue pressing for a fair, long-term settlement that protects essential services without exhausting reserves or placing an ever-greater burden on local taxpayers.
General Updates from HCC
Back-to-school support
Hampshire’s back-to-school resources bring together advice on preparing for the first day, walking, wheeling, cycling and school transport, before- and after-school childcare, SEND support, vaccination, mental wellbeing, attendance and free school meals.
All children in Reception, Year 1 and Year 2 are entitled to a free school lunch. Families receiving certain benefits may also qualify for income-based free school meals beyond those years. A successful application can unlock extra support for a child and additional funding for their school.
Family information and support: Connect to Support Hampshire
Hampshire’s young jazz musicians recognised
Hampshire Music Education Hub has been shortlisted at the Parliamentary Jazz Awards 2026 for its contribution to jazz education. Its inclusive programme supports more than 110 young musicians and introduces over 1,400 primary-school pupils to jazz each year.
This is wonderful recognition for the young performers, tutors, schools and partners who make Hampshire’s jazz programme so welcoming and successful. Congratulations to everyone involved.
No tricks, just three choices: apply for a secondary school place by Halloween
Parents and carers in Hampshire are being reminded not to let the secondary school application deadline give them a fright this Halloween
Plans progressed for more than 80 new special needs places across Hampshire
Plans have taken a step forward today for more than 80 new special needs places in Fair Oak, Basingstoke, Hart, Waterlooville, Eastleigh and Fareham
Hampshire partnership powers growth, skills and opportunity across the county
Thousands of Hampshire residents and businesses are benefiting from programmes that are boosting skills, creating jobs and driving economic growth, according to the latest annual report on the work of the Hampshire Prosperity Partnership Board. By bringing together leaders from business, education and local government, the partnership is unlocking opportunities, attracting investment and building a more prosperous future for communities across the county
Accessible scales to help disabled residents monitor their health
A new £30,000 grant scheme will help make routine weight checks easier, safer and more dignified for disabled people across Hampshire
Accessible scales to help disabled residents monitor their health | Hampshire County Council
Everyday actions helping Hampshire tackle a changing climate
From reducing energy use in schools to developing skills needed for jobs in renewable power, helping wildlife thrive, and making sure communities are prepared for the future, Hampshire County Council’s latest climate change report highlights the practical steps being taken to cut emissions and ensure Hampshire is prepared for the effects of a changing climate
Everyday actions helping Hampshire tackle a changing climate | Hampshire County Council
Smoking rates fall as Hampshire builds a healthier future
Smoking rates have fallen across Hampshire, more than 40,000 NHS health checks have been completed, and residents have been supported to improve their health through physical activity, family support and recovery services, according to new public health data from Hampshire County Council
Smoking rates fall as Hampshire builds a healthier future | Hampshire County Council
New support pathway to help Hampshire residents with complex care needs get home sooner after hospital stays
Older people, disabled residents and others who need ongoing care after a hospital stay could return home sooner and receive more coordinated support under a new approach approved by Hampshire County Council
Hampshire County Council calls for fairer share of Vehicle Excise Duty to plug highways funding gap
Hampshire County Council is stepping up its call for a fairer share of national transport funding, urging Government to provide long-term, sustainable investment in local roads and give greater flexibility over how funding is spent
Cllr Rhydian Vaughan MBE
Member for Calleva Division
Hampshire & IOW Fire & Rescue Authority
Hampshire County Council
Fb.com/tellrhydian
Appendix B –Planning Committee minutes
| Date: | 13th October 2026 | Time: 8.00pm |
| Place: | Bramley Room, Bramley Village Hall | |
| Present: | Cllr Chris Flooks (Chair) | Cllr Alan Munday |
| Cllr Jan Wright | ||
| In attendance: | Maxta Thomas (Clerk) | ?? member of the public |
| Apologies: | Cllr Chris Tomblin | Cllr Malcolm Bell |
| Action | ||
| 1 | Apologies for Absence | |
| As listed above. | ||
| 2 | Declarations of Interest | |
| None. | ||
| 3 | Minutes of the Last Planning Committee Meeting | |
| 3.1 | The minutes of the meeting held on 8th September 2026 were unanimously agreed to be a true record of the meeting and were signed by the Chairman. |
|
| 3.2 | Matters arising | |
| Number 14 bus route – HCC has decided that the number 14 bus route will not use Longbridge Road as a turning circle. |
|
|
| 4 | Planning & Development | |
| 4.1 | New Applications | |
| a. | 26/01914/PIP – Locksbridge Farm Cufaude Lane Bramley
Permission in Principle for the erection of 1no. dwelling maximum · The recent decision on the appeal for the site access at Locksbridge Farm was noted. · All previous objections to other applications still apply apart from comments about the flood zone, which has been updated by the EA. · Objection unanimously agreed. Clerk to take forward. |
Clerk |
| b. | 26/01965/LDPU – Cap D’or Ringshall Gardens Bramley
Certificate of lawfulness for a proposed use to operate a childrens home for up to 4 children and three staff members at any one time · No objection, subject to the usual checks and balances on number of staff and children. Unanimously agreed. Clerk to action. |
Clerk |
| c. | T/00466/26/TPO – 4 Herridge Close Bramley
Tree T1: No felling or pruning is proposed. This application seeks consent for the proposed outbuilding within T1s root protection area (RPA), using a reinforced concrete slab supported above ground on screw piles. The existing concrete hardstanding within the RPA will be removed carefully using hand tools or low-impact pneumatic equipment. Screw-pile locations will be adjusted to avoid roots 25 mm or greater in diameter. An arboriculturist will supervise the sensitive removal and excavations, and the tree protection fencing and ground protection shown on the submitted Tree Protection Plan will be installed and maintained during construction. The construction of the shed is within permitted development rights. · Defer to tree officer unanimously agreed. Clerk to action. |
Clerk |
| d. | 26/02026/HSE – Bryher The Street Bramley
Erection of front and rear extensions following demolition of existing garage and conservatory · Concerns whether the new window on the western side will overlook the neighbouring property. If yes, objection due to overlooking. If no, then no objection. Unanimously agreed. Clerk to action. |
Clerk |
| e. | Any other new applications
None. |
|
| 4.3 | Approvals/Refusals/Pending (see appendix A)
These were noted. |
|
| 5. | Appeals | |
| a. | 24/02924/FUL – Locksbridge Farm Cufaude Lane Bramley
Reinstate existing site access/current building works access to be used as the permanent private residential access and repositioning of outbuilding. Outbuilding to be a garage rather than the previously approved car port (part retrospective) · The appeal has been dismissed. |
|
| 6. | Water Issues | |
| No further update. | ||
| 7. | Local Plan Update | |
| BDBC has opened a Scoping consultation for the Local Plan. The deadline for comments is 20th November. This is on the agenda for the October full council meeting. | ||
| 8. | Neighbourhood Plan | |
| No update at present. | ||
| 9. | Date of Next Meeting | |
| The next Planning Committee meeting is scheduled for Tuesday 10th November 2026, to be held at the Bramley Room at Bramley Village Hall.
Meeting closed at 8.33pm. |
||
Appendix A – Planning Summary
Approvals/Refusals*
| 1. | 26/01317/HSE – 2 Yew Tree Close Bramley
Proposed first floor side extension |
Granted
No objection |
| 2. | 26/01452/LDPO – 2 Burlington Way Bramley
Certificate of Lawfulness for the proposed use of the siting of a mobile home on residential land for ancillary residential use |
Granted
Objection |
| 3. | T/00388/26/TPO – Oak House Officers Row Bramley
T1, T2, T3, T4, T5, T6 – pruning works |
Granted
Defer to TO |
| 4. | T/00401/26/TPO – Street Record Officers Row Bramley
Horse Chestnuts (T1 to T5) to repollard within G13 TPO number 0467 |
Granted
Defer to TO |
Pending Applications*
| 1. | 20/03204/VLA – Land At Minchens Lane Bramley
Variation of Section 106 agreement attached to 14/01075/OUT to enable the transfer of the Equipped play area, northern kick about and southern kick about areas to the existing management company instead of the Parish Council |
No comment as PC has interest in application |
| 2. | 24/02019/OUT – Land At Goddards Farm Reading Road Sherfield-on-Loddon
Outline planning (including access and strategic landscaping for approval) for up to 130 market and affordable homes, a commercial and/or community building, public open space, off-site highway improvements plus access from Reading Road. |
Objection |
| 3. | 25/00322/ADV – Land At Stocks Farm The Street Bramley
Proposed non-illuminated signage comprising 2 Flag and pole signs, 1 Fascia Sign and 2 stand alone signs. |
No objection, comments |
| 4. | 25/01053/RET – Cufaude Cufaude Lane Bramley
Erection of four no. poles with floodlighting and CCTV cameras and 3 no. poles with CCTV cameras. (retrospective). |
Objection |
| 5. | 25/02436/HSE & 25/02437/LBC – Middle Farm The Street Bramley
Erection of replacement porch to front; erection of replacement porch to rear with pergola; Increase size of existing aperture to Living room to allow for installation of new doors to rear. Replacement door |
Objection |
| 6. | 25/02416/HSE – 31 Moat Close Bramley
Installation of fence, concrete pillars and metal gate (part retrospective). |
Objection |
| 7. | 25/02934/OUT – Land West Of Upper Cufaude Farm Cufaude Lane Bramley – AMENDED
Outline planning application for residential development, with vehicular access to be provided from the access approved under Outline permission: 19/00018/OUT and Phase 1 Reserved Matters permission: 23/02003/RES; and the provision of; cycle and pedestrian accesses, open space, landscaping, SuDS, and other associated infrastructure. All matters reserved except for access. |
Objection |
| 8. | 25/02253/FUL – Football Changing Rooms And Adjacent Field The Street Bramley
Demolition of existing outbuildings and erection of 2 outbuildings for new changing rooms and clubhouse and associated new car park spaces area |
No objection |
| 9. | 26/00368/FUL – Park Gate Farm Bramley Corner Bramley
Demolition of existing barn and erection of a lifetime dwelling |
No objection, comments |
| 10. | 26/00477/VLA – Land To The North Of Sherfield Road Bramley
Variation of S106 agreement attached to 15/02708/OUT to allow the leaseholder of the shared ownership unit 9 Meadowland Close, Bramley, to staircase to 100% equity in the property |
No objection |
| 11. | 26/00887/OUT – Land At Bramley Meadows Folly Lane Bramley
Outline Application (with all matters reserved except for access) for residential-led development of up to 650 residential units (Use Class C3) including on-site affordable housing; provision of up to 0.55ha of land for a Local Centre comprising commercial, business, service uses (Use Class E), up to 1.5ha of land for Primary School Education (Use Class F1), up to 0.35ha of land for Employment (Use Classes B2 and E); new vehicular and pedestrian access from Sherfield Road and Bramley Lane; the provision of up to 0.16ha of land for multi-use car park; provision of Community Park, supporting landscaping, on-site Biodiversity Net Gain, open space, allotments and related infrastructure; together with outdoor sports and leisure |
Objection |
| 12. | 26/00932/FUL – 3 Farriers Close Bramley AMENDED
Conversion of habitable accommodation into garage and replacement of window with garage door, erection of fence and gate alongside boundary |
Objection withdrawn |
| 13. | 26/01338/TDC – Land To The West Of Little Oak Silchester Road Bramley
Application for Technical Details Consent in respect of the erection of 3 no. dwellings, in accordance with Permission in Principle Ref 25/01127/PIP |
Objection |
| 14. | 26/01418/HSE – Manor Barn Cufaude Lane Bramley
Installation of 16 no. solar panels on two outbuildings |
No objection |
| 15. | 26/00928/FUL – Abbots Dwell Latchmere Green Little London
Construction of manege and erection of stables and store |
No objection |
| 16. | 26/01584/HSE – 4 Herridge Close Bramley
Single storey rear extension and two storey side extension, incorporating first floor extension above part of existing garage. Construction of pergola |
No objection |
| 17. | 26/01665/HSE – Upper Cufaude Farm, Oak Tree Barn Cufaude Lane Bramley
Conversion of loft to living accommodation and installation of roof lights at Oak Tree Barn |
Objection |
| 18. | 26/01722/FUL – The Bramley Inn The Street Bramley
Use of former stable block for ancillary staff or guest accommodation |
No objection |
| 19. | 26/01721/HSE – 1 Bow Street Bramley
Erection of two storey rear extension and installation of solar panels |
No objection |
*Objections/no objections listed are the decision of Bramley Parish Council only, and do not reflect any submissions placed by members of the public or other bodies with Basingstoke & Deane Borough Council.
Appendix C – CIL Statement
Click here for the October 2026 CIL Statement
Appendix D – Finance Statement
Click here for the October 2026 Finance Statement