Parish Council meeting minutes – 17th September 2024

BRAMLEY PARISH COUNCIL

 

Minutes of the Meeting of the Council

Date: Tuesday 17th September 2024 Time:    7.00pm
Place: Bramley Room, Bramley Village Hall
Present: Cllr Tony Durrant (Chair) Cllr Malcolm Bell
  Cllr Chris Flooks Cllr Jan Wright
  Cllr Sue Howell Cllr Chris Tomblin
  Cllr Alan Munday
In attendance: Maxta Thomas (Clerk) 5 members of the public
Apologies: Cllr Iain James Cllr Keith Oborn
  Cllr Rhydian Vaughan (County)

 

Action
1 Apologies for Absence  
As listed above.  
2 Declarations of Interest  
Cllr Durrant declared an interest in planning matters due to his position on the BDBC Development Control Committee.  He took no part in any planning decisions.  
3 Minutes of the Last Parish Council Meeting  
3.1 The minutes of the meeting held on 16th July were proposed Cllr Durrant and seconded by Cllr Howell and unanimously agreed as being a true record of the meetings.  The Chairman duly signed the minutes of the meeting.  

 

3.2 Matters arising  
None.  
3.3 Outstanding actions  
·          Nothing to report.  
4 Open Forum  
·         A resident queried overgrown vegetation on the Cinder Track.  Cllr Durrant noted that the PC contractor did clear some of the ground level vegetation to make path safe, as promised at the previous meeting.  There has been nothing from HCC Rights of Way as yet – the Clerk has chased and will chase again.

Cllr Tomblin noted that SINC next to the Cinder Track has ownership issues, which he is trying to track down.  Until this is resolved, BDBC cannot do anything about this area.

 

 

 

Clerk

 

5. County Councillor Report – see appendix A.  
6. Borough Councillor Report – Cllr Tomblin gave a verbal report.

·          50 years of Basingstoke – BDBC is looking for old photos from 50 years ago when Borough was created.  If anyone has any memories please contact BDBC via their website.

·         Top of Town – a lot of maintenance work has been carried out at the Top of Town.  There will be a live music event on 28th September.

·         Local Plan Update – it is at a stage where it is being prepared to submit to the Planning Inspector.  However, the new Government consultation on the NPPF is likely to have an impact on this.  The Borough is likely to need another 400 houses per year.

·         Cllr Bell asked about Manydown.  Everything is ready to be signed off; however, there are issues with the Manydown companies which has slowed the process, and now HCC have also delayed matters.  However, this may be resolved very soon.

 
7. Parish Environment  
7.1 Land purchase at Longbridge Road update – the purchase of the Village Green land at Longbridge Road is now complete, with Bramley PC taking full control of the land.  Some minor clearance has already been completed, to make the site accessible for contractors, but restricting it for all other vehicles.

The existing fence and fence posts will need to be removed, which will open up the land alongside the Cinder Track.  The fence post removal will need to be carried out by a specialist contract as they are made of asbestos.  A quote for £1600 for the post removal has been received, and it has been recommended that this happen at the same time as the removal of the fence (£650).  Cllr Tomblin proposed that this work be carried out immediately, Cllr Howell seconded, unanimously agreed.  Clerk and Cllr Durrant to take forward.

Cllr Durrant proposed that the land be cleared completely, as it is currently very overgrown.  The plan at present is to make the space accessible to all residents as open green space, with part of it set aside as a biodiversity space.  It is anticipated that this work will take approximately 12-24 months.  Whilst some of the cost will be met from CIL funding, grants will also be sought.

 

 

 

 

 

 

 

Cllr Durrant/ Clerk

7.2 S.106 funding update – Cllrs Durrant and Bell have been liaising with officers at BDBC to see how some outstanding s.106 funding may be spent in the Parish.  There is approximately £33k earmarked for sports and leisure facilities, which is likely to be used for new changing room facilities at Bramley Football Club.

A further £7700 earmarked for play spaces and approx £2800 for open spaces may be used towards the playground surface at the Clift Meadow playground.  However, so far two very expensive quotes have been received for this.  Just to do the in between spaces will cost approx. £16k.  Alternative projects are being considered.  A possible open space expenditure project would be straightening the path near the Pavilion – Graham Auld to obtain quotes.

 

 

7.3 Bramley Green ditches – the Clerk noted that it has become apparent that the ditches at Bramley Green need to be cleared and widened to their original width.  This will need to be carried out over the summer.  Two quotes have been received.  After some discussion, it was proposed by Cllr Bell and seconded by Cllr Wright that quote 1 from R C Saunders would be accepted, and that the spoil from the ditch clearance should be used to build up the bunds on the Green side of the ditch.  The total for this work will be £3600+VAT.  This was unanimously agreed.  Clerk to take forward.

Cllr Durrant further proposed that a community spring bulb planting event should be organised to help replace the bulbs that will be buried.  Cllr Bell to consult on what bulbs to plant.

 

 

 

 

 

 

Clerk

 

Cllr Bell

8 Events  
8.1 VE day 80th Anniversary – Cllr Bell asked Councillors whether Bramley Parish Council should hold an event in 2025 for the VE day 80th anniversary, similar to that this year for D-Day commemorations.

A beacon lighting event with people bring their own food and drink for a picnic was suggested.

Cllr Bell noted that the Pageant Master has suggested a beacon lighting at 9.30pm, with an anthem to be played earlier.

Cllr Tomblin suggested handing event management over to local cadet groups and open it up to the wider population.

Tabled for future discussion.

 
9 Clerk’s report & Administration  
9.1 Parish magazine article – Cllr Oborn will write the article for the November issue of the Parish magazine.  Copy is due by 15th October.  Thanks to Cllr Munday for copy for the September edition, and Cllr Durrant for the October edition.  

Cllr Oborn

9.2 Audit update – the Clerk reported that she has received the external Audit information back from BDO.  Bramley Parish Council has been given a completely clear audit, with no supplementary questions from the external auditor.  Details are on the PC website.  
9.3 Parish Council insurance – the Clerk has received the renewal documentation from Clear Insurance.  She reported that the renewal figure of £1470 remains competitive, and that public liability insurance for the newly purchased Village Green is included in this figure.  Cllr Tomblin proposed accepting the quote as written, Cllr Wright seconded, unanimously agreed.  Clerk to process.  

 

 

Clerk

10 Reports  
10.1 Planning Committee (see appendix B) – Cllr Flooks noted the recent planning committee meeting.

i.            August planning decisions – Cllr Flooks noted the August planning decisions, which were made by email due to the summer recess.  Cllr Munday proposed ratifying these decisions, Cllr Wright seconded, unanimously agreed.

ii.            NPPF consultation – Councillors have met recently to discuss the PC response to this consultation.  Another meeting is required to finish the work, which is scheduled for this week.  The Clerk will submit the response when complete, and by the 24th September deadline.

iii.            Neighbourhood Plan Update – nothing to report.

 

 

 

 

 

 

 

Clerk

10.2 Allotments and Burial Ground – Cllr Howell gave a verbal report.

·         Some of the allotment plots at Grays Meadow  have been cleared and reallocated.  The hedging work is complete, and the path clearance is also done.  Cllr Howell is due to meet with the Clerk and Cllr Durrant in the near future to discuss a way forward for the allotments.

 

 

10.3 Village Hall Trust

·         The kitchen refurbishment is complete.

·         The fire alarm work is complete.

·         Redrow are still using the Village Hall access track to access the Stocks Farm site.  This will change once the proposed access via the ‘Selworthy’ site is opened up in the autumn.

 
10.4 Clift Meadow Trust

Xmas tree – CMT are looking at planting a tree – it will cost around £2k.  This will be for the Xmas lighting event.

Next Trustees meeting is next week.

 

 

10.5 Highways/Footpaths – the Clerk reported that various roadworks are being carried out at present.  Some are on behalf of Gigaclear, and some are carriageway patching work on behalf of HCC Highways.  Notices go on the PC Facebook page as the Clerk receives them.

There has been some issues recently with roadworks on behalf of Gigaclear.  These have been reported to Gigaclear, who has assured Bramley Parish Council that they will try to avoid such issues in the future.

 
10.6 Chairmans Report – nothing to report.

Cllr Durrant invited Howell to give an update on the Bramley Show.  Cllr Howell reported that the Show was very successful, with a good number of residents attending from across the community and competing in the Show.  She thanked the PC for its support.

 
11 Consultation documents requiring consideration  
None.  
12 Grant Applications  
12.1 St James Church –  Cllrs considered whether to increase the previously agreed £2000 grant towards the restoration of the headstocks for the Church bells.  Cllrs voted that this should come from CIL funding, and that the grant should not be increased.  Cllr Tomblin proposed the motion, Cllr Munday seconded, unanimously agreed.  Clerk to take forward.  

 

 

Clerk

12.2 Clift Meadow Trustees – CMT have requested at grant for £923+VAT for the installation of outdoor power sockets for outdoor events.  These will be on Brocas Hall.  Cllr SH proposed giving the grant, Cllr JW seconded, unanimously agreed.  Clerk to process.  This grant will come from CIL funding.  

 

Clerk

12.3 Wilder Bramley – Wilder Bramley have £280 unspent grant funding from January 2024.  This was made for the Greening Campaign, which ultimately did not receive the hoped for resident support.

Wilder Bramley has insurance as a charitable organisation, which is now due.  The cost of this insurance is £281.  They have asked that the Greening Campaign funding be diverted to pay for the insurance.

Cllr Flooks proposed agreeing reallocation of grant funding, Cllr Tomblin seconded, unanimously agreed.  Clerk to take forward.

 

 

 

 

 

 

Clerk

13 Finance  
13.1 Approval of payments (see appendix C and D) – the Clerk has circulated the list of payments for approval for both August and September.  The August payments were agreed via email.  Cllr Howell proposed and Cllr Bell seconded that the August payments approval be ratified, and that the September payments be approved.  Unanimously agreed.  Clerk to process.  

 

 

Clerk

13.2 CIL Income & Expenditure update – see appendix E.  
13.3 Receipts – these were noted.  The Clerk noted that the second half of the precept (£43k) is due at the end of September, and that a VAT claim for approximately £4800 will be submitted at the beginning of October.  CIL income is also expected in early October, although the amount has not yet been confirmed.  
14 Date of Next meeting  
The next full Parish Council meeting is scheduled for Tuesday 15th October 2024.  
15 Resolution to exclude press and public from items that may require discussion of possible legal and financial proceedings  
Cllr Munday proposed the motion, Cllr Wright seconded, unanimously agreed.  The public and press left the meeting.  
16 Confidential Items  
16.1 Councillor sabbatical – Cllr James has been offered and accepted a 3-6 month post in Portugal.  Cllr Tomblin proposed that Cllr James be granted a formal sabbatical from Bramley Parish Council for this period.  Cllr Howell seconded, unanimously agreed.  
   
The meeting closed at 9.11pm.  

 

      

 

Appendix A – September Briefing notes

COMMUNITY SPEEDWATCH

SIDsThe SIDs were in operation throughout August. (See Table 2)

Recent Local SpeedWatch Activity4 manned Deployment were undertaken during August.  A total of  53 vehicles were reported to the Police from the 569 vehicles checked – hit rate 9.3%. Top speed recorded 50 mph.  1 vehicle was recorded at 50 mph on The Street. The Vehicle driver has been visited by the police.

EquipmentNothing to report.

Table 1: Camera Data

The following camera data was downloaded on the 31st of August 2024. Traffic volumes down, holidays?

 

Month/Year Verified Speeders =>35mph Max Speed Recorded  Highest number of offences committed by one vehicle Fastest Hour Illegal

Vehicles

May 2024 2752 58 15 7pm
June 2024 3338 60 17 10am
July 2024 3104 61 18 2pm
August 2024 2616 59 13 5am 73
Total Verified speeders 11810

 

The Camera trigger and reporting speed are set at =>35mph.

I have added to Table 1: Camera Data the number of illegal vehicles, no tax, no Mot, or no Tax and Mot.

 

Camera statistics for August 2024

Table 2: Speed Indicator Device (SID) DATA August 2024:

SID Location Days Deployed Traffic 

Direction

%

Exceeding

30mph

No

Exceeding

60mph

Max

Speed

Recorded

V85* Average speed
Farriers  31 West 50% 7 70 36 31
The Street by Churchlands 31 East 46% 12 69 35 30

*V85: 85% of vehicles are driving slower or exactly this speed.

 

ALLOTMENTS/BURIAL GROUND

No written report received.

 

VILLAGE HALL TRUST

No written report received.

 

CLIFT MEADOW TRUST

No written report received.

 

BOROUGH COUNCILLOR REPORT 

No written report received.

 

COUNTY COUNCILLOR REPORT

Reporting Highway Problems

Links to report road issues are here:

  • Potholes:

https://www.hants.gov.uk/transport/highways/report-a-problem/potholes/report-pothole    

  • Tree/hedge problems:

https://www.hants.gov.uk/transport/roadmaintenance/roadproblems/treehedge

  • Flooding/drainage issues:

https://www.hants.gov.uk/transport/highways/report-a-problem/flooding  

  • Pavement problems:

https://www.hants.gov.uk/transport/highways/report-a-problem/paving  

  • Problems with rights of way:

https://www.hants.gov.uk/landplanningandenvironment/rightsofway/reportaproblem

When reporting an issue, you’ll be sent an email confirming a reference number for the report.  If you would like me to follow this up for you then do please forward that message to me and I will chase for you

 

County Council Farms – Start Up Opportunities

County Farms – Hampshire County Council provide start up opportunities for young people hoping to make farming their career.

We’re not unique as a county in offering this, but have one of the most extensive county farm projects in the country, of which Hampshire is rightly proud.

There are new farming opportunities coming up, details of which are below. Do please share with anyone who might be interested.

 

General HCC News:

COULD YOU SWAP YOUR CAR FOR A BIKE THIS SUMMER?

With longer daylight hours and warmer temperatures now is the perfect time to consider cycling.  To help encourage people to get around on two wheels, the County Council has created a one-stop-shop website with everything you’ve ever wanted to know about cycling in Hampshire

Could you swap your car for a bike this summer? | Hampshire County Council (hants.gov.uk)

 

£1.5M BOOST FOR PEOPLE LED CLIMATE CHANGE ACTION

Lower energy bills could be enjoyed by more people in the future as more communities are given the ability to lead the charge on climate change through greener, more efficient energy initiatives that will reduce carbon emissions and, in turn, lower costs

£1.5m boost for people led climate change action | Hampshire County Council (hants.gov.uk)

 

EXAM HELPLINE NOW OPEN AS HAMPSHIRE’S POST-16 LEARNERS RECEIVE RESULTS

Thousands of Hampshire students have received the results of their hard work towards A-levels, T Levels, Technical, Vocational, and Apprenticeship qualifications

Exam helpline now open as Hampshire’s post-16 learners receive results | Hampshire County Council (hants.gov.uk)

 

TAP INTO SOLAR POWER TO SAVE ON BILLS AND TACKLE CLIMATE CHANGE

An opportunity for Hampshire residents to benefit from competitively priced, high-quality solar panel installation and save on future energy bills is once again available through the 2024 Solar Together scheme

 

Tap into solar power to save on bills and tackle climate change | Hampshire County Council (hants.gov.uk)

 

HAMPSHIRE OPENS GCSE HELPLINE AS THOUSANDS OF PUPILS SET TO RECEIVE RESULTS

Hampshire County Council is urging anyone with concerns about their GCSE or other Level 2 results to get in touch to talk through their post-16 options with a careers adviser

Hampshire opens GCSE helpline as thousands of pupils set to receive results | Hampshire County Council (hants.gov.uk)

 

MAKE ATTENDANCE TOP OF THE ‘BACK TO SCHOOL’ CHECKLIST FOR 2024/25

Hampshire County Council is renewing its call for parents and carers to prioritise regular school attendance in the new academic year

Make attendance top of the ‘back to school’ checklist for 2024/25 | Hampshire County Council (hants.gov.uk)

 

Cllr Rhydian Vaughan MBE

Fb.com/tellrhydian

 

 

Appendix B – Planning Committee Minutes

 

Date: 10th September 2024 Time:    8.00pm
Place: Bramley Room, Bramley Village Hall
Present: Cllr Chris Flooks (Chair) Cllr Malcolm Bell
  Cllr Alan Munday
In attendance: Maxta Thomas (Clerk) ?? member of the public
Apologies: Cllr Chris Tomblin

 

Action
1 Apologies for Absence
As listed above.
2 Declarations of Interest
None.
3 Minutes of the Last Planning Committee Meeting
3.1 The minutes of the meeting held on 9th July 2024 were unanimously agreed to be a true record of the meeting and were signed by the Chairman.  

 

3.2 Matters arising  
None.  
4 Planning & Development  
4.1 New Applications  
a. 24/01871/ROC – Cherry Blossom Manor German Road Bramley

Variation of conditions 1, 4, 9 and 11 of approved Planning 24/00679/FUL (Erection of two storey extension to care home, plus garden pavilion and five additional car parking spaces) to reduce footprint of extension and additional details

·         No objection unanimously agreed.  Clerk to process.

 

 

 

 

 

Clerk

b. 24/01966/PIP – Locksbridge Farm Cufaude Lane Bramley

Permission in Principle for the residential development of 1 no. dwelling (Class C3)

·         Proposed access road comes out on Cufaude Lane very close to a bend on a very narrow part of the Lane.  This is not a suitable access point to the site.  It is also not the access point as agreed in the existing planning permission for the building currently being erected.

·         Outside the Settlement Policy Boundary.

·         Overdevelopment of site.

·         It is an isolated site for dwelling.

·         The proposed development will increase traffic on a very narrow part of Cufaude Lane.

·         Objection unanimously agreed as above.  Clerk to process.

 

 

 

 

 

 

 

 

 

 

 

 

Clerk

c. 24/01925/HSE – 6 Browns Close Bramley

Erection of a fence

·         Members noted the loss of biodiversity with the felling of the trees

·         However, no objection unanimously agreed.  Clerk to process.

 

 

 

Clerk

d. Any other new applications

·         24/01913/FUL – Withy Place Bramley Road Silchester

Installation and operation of a 50MW Battery Energy Storage System                 (BESS), including access and associated infrastructure

o   There is little detail in the application on how the site will be connected with the Bramley sub-station.

o   Flood risk – the road regularly floods several times a year at various points, along with the surrounding land.  Indeed panoramic view 1 shows the flood sign on the road.

o   The proposed development is adjacent to existing housing, and takes away the panorama from the nearby footpaths.

o   It is questionable that there will be facilities at the Bramley sub-station to allow connections for this and other proposed battery installations until 2030.

o   Any contamination from a possible fire at the site will go straight into the water course, as no bunding to prevent this is proposed.

o   Members noted concerns about the fire safety of such installations.

o   Objection unanimously agreed.  Clerk to process.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clerk

4.2 Approvals/Refusals/Pending (see appendix A)

These were noted.

 
5. Appeals  
5.1 APP/H1705/W/24/3342479 – Meadow View, Sherfield Road, Bramley

Application number 23/02946/FUL – Erection of 2no semi-detached 2no bedroom bungalows and creation of a new access following the demolition of an existing green house

·         Bramley Parish Council submitted its comments to the Planning Inspector as agreed at the July 2024 Parish Council meeting.  A decision is awaited.

 

 

 

6. Update – Stocks Farm reserved matters application – 23/02868/RES  
  Cllr Tomblin reported that the developer has made direct contact with him in his Borough Council ward councillor capacity, and that he and Cllr Flooks will be meeting with the developer to discuss various issues on 12th September.

In the meantime, various residents and interested parties have made representations to the Planning Officer about the water and drainage issues both on site and in the general area.

 
7. Water Issues  
  Cllr Bell gave a brief update.  Work on the improvement works to the Bramley SPS1 sewer pipeline is due to start no later than early June 2025, and is due to be complete by mid-November 2025.

Sherfield is having issues with sewage flooding, which is down to damaged pipes.  Thames Water are looking at methods of repairing the pipes to resolve the problems.

 
8. NPPF Consultation – Update  
  Councillors met recently to put together the Bramley PC response to this consultation.  The response is about half way through and needs more work.  After some discussion, it was agreed that a second meeting with all councillors should be scheduled to complete the consultation response.  Clerk to take forward.  

 

 

 

Clerk

8. Local Plan Update  
No update at present.  Further review may be required in the light of the new Government’s requirement for more houses to be built.  
9. Neighbourhood Plan  
No update at present.  
10. Date of Next Meeting  
The next Planning Committee meeting is scheduled for Tuesday 8th October 2024, to be held at the Bramley Room at Bramley Village Hall.

 

Meeting closed at 9.18pm.

 

 

 

Approvals/Refusals*

1. 24/01367/HSE – 1 Ringshall Gardens Bramley

Erection of a single storey side extension to garage

Granted

No objection

2. 23/02051/HSE – 3 Churchlands Bramley

Proposed loft conversion with front dormer and creation of front porch

Granted

No objection

3. 23/02912/OUT – Boarsbridge House Bramley Road Little London

Erection of one detached dwelling and garage access utilising an existing access to the south of Boards Bridge Road on land adjacent to Boars Bridge House, to include access and layout

Refused

 

Objection

4. 24/00409/FUL – Lantern Courtyard, The Barn The Street Bramley

Change of use from Class F2(A) to Class E (for bistro & farm shop use), installation of extractor vent and air conditioner outdoor units. Display of various advertisement signs and lighting.

Granted

 

No objection, comments

5. 24/00410/ADV – Lantern Courtyard, The Barn The Street Bramley

Display of 2 no fascia signs with washer lights, 1 no. logo sign and 1 no. non-illuminated wall sign.

Granted

No objection, comments

6. T/00210/24/TPO – 5 Pound Close Bramley

T1 Beech: fell, grind out stump/roots.

Granted

No objection

7. T/00216/24/TPO – 4 St Marks Close Bramley

1 Silver birch: fell.

Granted

No objection, comments

8. 24/00695/FUL – Land At Cherry Blossom Manor German Road Bramley

Single storey dental surgery with associated car and cycle parking

Granted

No objection, comments

9. T/00214/24/TPO – 14 Wallis Drive Bramley

Tree in front garden: pollard.

Part granted/ Part refused

Defer to Tree Officer

10. 24/01182/FUL – Meadow View Sherfield Road Bramley

A new 3 bedroom detached bungalow to the rear of Meadow View

Granted

Objection

 

 

Pending Applications*

1. 20/03204/VLA – Land At Minchens Lane Bramley

Variation of Section 106 agreement attached to 14/01075/OUT to enable the transfer of the Equipped play area, northern kick about and southern kick about areas to the existing management company instead of the Parish Council

No comment as PC has interest in application
2. 22/01703/VLA – Land At The Street The Street Bramley

Variation of section 106 agreement attached to 15/02682/OUT to insert mortgagee in possession clause

No comment
3. 23/02091/VLA – Land At Minchens Lane Bramley

Variation of Section 106 agreement attached to 14/01075/OUT to allow an amended Mortgagee Exclusion Clause

No comment
4. 23/02528/VLA – Land To The North Of Sherfield Road Bramley

Variation of section 106 agreement and deed of variation attached to 15/02708/OUT to update the mortgagee exclusion clause (MEC)

No comment
5. 23/02868/RES – Land At Stocks Farm The Street Bramley

Reserved matters application submitted pursuant to outline planning APP/H1705/W/22/3302752 for 140 dwellings, Class E Community building, public open space, landscaping, drainage, parking, and associated infrastructure works.

Objection
6. 24/00075/FUL – Land To The East Of Ash Lane And Ash Park Business Centre Ash Lane Little London

Construction of a battery Storage Facility with ancillary development

Objection
7. 24/00446/FUL – Cufaude Cufaude Lane Bramley

Change of use of land from Residential to Agricultural with erection of tractor shed on site. Change of use of land from Agricultural to Residential.

No objection, comments
8. 24/01149/HSE – 82 Kirby Drive Bramley

Installation of air source heat pump to rear of property

No objection
9. 24/01165/OUT – Bow Brook Farm Vyne Road Bramley

Outline planning application for the construction of 50 dwellings with all matters reserved except for access

Objection
10. T/00273/24/TPO – 3 Taylor Drive Bramley

Horse chestnut: reduce height and cut back overhang

Defer to Tree Officer
11. 24/01362/RES – Land At Upper Cufaude Farm Cufaude Lane Bramley

Reserved Matters planning application for approval of layout, landscaping, scale and appearance for the Phase 2 residential development and Community Building and associated works pursuant to Outline planning permission: 19/00018/OUT

Objection
12. T/00331/24/TPO – Royal British Legion The Street Bramley

G1 (mixed species): Re-coppice.

Defer to Tree Officer
13. T/00373/24/TCA – The Gables 1 Churchlands Bramley

Beech trees: Height Reduction: Reduce the height of the beech trees to below the gutter level (4.5 meters) of the neighbouring house.

Style Modification: Return the trees to a pleached style hedge to ensure they are maintained in a controlled and visually appealing manner.

Defer to Tree Officer

 

*Objections/no objections listed are the decision of Bramley Parish Council only, and do not reflect any submissions placed by members of the public or other bodies with Basingstoke & Deane Borough Council.

 

Appendix C – August Finance Statement

Click here for the August 2024 finance statement

 

Appendix D – September Finance Statement

Click here for the September 2024 finance statement

 

Appendix E – CIL Summary

Click here for the September 2024 CIL summary